Project name: On Job Capacity Building during Operation for EEHC Staff within the Production Companies at Beni Suef, Burullus & New Capital City

Project Description

The project comprises 3 SIEMENS C.C. Plants, each of capacity 4,800 MW. Each Plant comprises the following:

Eight (8) Siemens Combustion Turbine Generators (CTGs) Frame (H), Gas Fired Turbine Generator Equipment Package with all required Balance of Plant Systems.

Eight (8) Heat Recovery Steam Generators (HRSGs) NEM, Benson type with all required Balance of Plant Systems.

Four (4) Siemens Steam Turbine Generators (STGs) with all required Balance of Plant Systems.

Four (4) Water Cooled Condensers with all required Balance of Plant Systems.

Four (4) Cooling Towers with all required Balance of Plant Systems.

The Plants utilizes Seawater as its Raw Water Source. The Plants is planned to be operated by Fuel Gas only. Two CTGs have the Capability to run on Light Fuel Oil. Power generated will be stepped up through main Transformers and fed to the Utility 500 kV Grid, via a Gas-insulated Switchgear (GIS) Switchyard.

Scope of Services

Environmental & Social (E&S) model for Environmental, Health & Safety (EHS)/Social function

On job Capacity Building during Operation to aid current nominated E&S EEHC “PC-Staff” through on-the-job training and coaching to be able to fulfill the E&S obligations during plant operations