Project name: Regulator with Water Lock in Bahr El Baqar
Project Description
The Regulator with Water Lock in Bahr El Baqar is loctaed in East Suez, Egypt comprises the proposed route to transfer 5 million m3/ day from Bahr El Baqar Drain to the treatment station in East Suez Canal by the Salam Canal
Scope of Services
Structural Design, Specifications and BOQ for a Barrage with Water Lock with a bridge on top in Bahr El Baqar Drain.









